| Currency |
|
| Reduction of downtime in % |
|
| Number of Wind Turbines |
|
| Size of Wind Turbine in MW |
|
| Expected full load hours per year |
|
| Payment per kWh |
|
| Expected lifetime in years |
|
| Number of MCM Measurement points |
|
| Number of SVM Measurement points |
|
| TCM Server Configuration |
|
| Connection type to the site |
|
| Installation type |
|
| Elecrical RPM signal available in the nacelle |
yes |
| Electric Active Power signal available in nacelle |
yes |
| Power supply available in nacelle (24VDC 3A) |
yes |
-| Lan in nacelle |
yes |
| Financial interest rate pro anno % |
|
|
| Cost of TCM equipment for all wind turbines |
|
| Financial cost of TCM equipment over life time |
|
| Retrofit Installation costs |
|
| Service costs over life time |
|
| Total costs over life time |
|
| Avoided downtime in hous over life time |
|
| Saved Production loss in MWh over life time |
|
| Saved Money over life time |
|
| ROI (Saved Money / Total Cost in life time - 1) % |
|
| Get detailed report by email - Yes (You
accept that Gram &
Juhl A/S can contact you by email) |
|
| Gram & Juhl A/S - All rights reserved |
|